Key takeaways
- 1
- Ask whether the minimum is per style, per colour or per order. The same 100 pieces can mean 100 or 300 depending on the answer.
- 2
- Get the defect policy in writing before bulk: a clear window to report problems and who pays for remakes and shipping.
- 3
- Never send a deposit to a personal bank account. The account name should match the company on the invoice.
The questions to ask a clothing manufacturer fall into six stages: before the quote, sampling, bulk production, quality, payment and shipping. Most founders only ask about price and minimums, then find out the rest the expensive way. Below is the list we'd use if we were sourcing for our own brand, with why each question matters and what a good answer sounds like. A good answer has a number in it and you can get it in writing. A vague one ("depends", "no problem", "very fast") is a signal to ask again.
Print this out. Ask every factory the same questions so you can compare like with like.
Questions to ask a clothing manufacturer before you get a quote
1. What is your minimum order, and is it per style, per colour or per order? This is the question that changes the maths most. A minimum of 100 per style sounds fine until you learn it's 100 per colour, and your three colourways are now 300 pieces. A good answer separates the three clearly. Ours: 100 pieces per style for most products, 50 for caps. Each colour? Yes, each colour needs its own minimum. More on why factories set minimums in our guide to what MOQ means.
2. Can I split sizes however I like within that minimum? Some factories force a fixed size ratio. You want to choose your own run, say heavier on M and L.
3. What exactly does the unit price include? Fabric, sewing, one print, a neck label, a poly bag? Or just the blank? Two quotes of $18 can be $6 apart once you add labels, packaging and artwork setup. Ask for the price assumptions in writing. Ours are listed on our pricing page.
4. Where does the fabric come from, and what weight is it? A good answer names a weight (GSM or oz) and a composition, such as 400 GSM cotton-polyester fleece. If the factory can't tell you the weight, it can't promise you the same fabric next time.
5. How long is this quote valid? Cotton prices move. A quote without a validity date can change after you've planned your launch around it. Ours hold for 30 days.
6. Will you sign an NDA before I send designs? Original designs deserve protection. Our answer: Yes, we sign your NDA before you send designs.
Sampling questions
7. What does a sample cost, and is it credited against bulk? Paying for a sample is normal. Sampling uses a pattern maker's time and a sewing line set up for one piece. What you want to know is whether that money comes back when you order. Ours run $40–120 depending on the work. Credited in full against a bulk order of the same style. Our guide on what a sample costs explains the spread.
8. How long until I have the sample in my hands? Ask for production time and shipping separately. Two weeks to make plus a week in transit is three weeks, not two.
9. How many revision rounds are included? The first sample is often close but not right. A sleeve is 2 cm long, the print sits too low. A good factory tells you how many rounds are in the price and what a third round costs.
10. Will the sample be made in the bulk fabric, on the bulk line? A sample sewn by the best machinist in the building on leftover fabric can look better than your bulk order. Ask whether the sample fabric is the same lot or the same supplier as bulk.
Bulk production questions
11. What is the lead time for bulk, counted from when? From deposit? From sample approval? From fabric arrival? A good answer names the starting point. Ours is 20–25 working days for private label bulk.
12. How will I know where my order is? Silence for four weeks is the most common complaint founders have about factories. Ask how often you'll get updates and in what form. Ours: twice a week, with photos.
13. What is your quantity tolerance? Cutting and sewing always produce a few over or under. A normal factory states it as a percentage. Ours is ±3%. If you ordered 100 and need exactly 100 for pre-orders, say so upfront.
14. Can I cancel, and until when? The real answer is usually "until fabric is cut". After that, the money is spent. Get the cut-off in writing. Ours: You can cancel free of charge before the deposit is paid, and after that until fabric is cut.
Quality control questions
15. At what stages do you check quality? A final check at the end is not enough. Problems found after sewing cost far more to fix than problems found when fabric arrives. A good answer lists the stages. We run 5: Fabric inspection on arrival, inline checks during sewing, a measurement check against your spec, a final AQL 2.5 inspection, and a packing check before cartons are sealed.
16. What inspection standard do you use for the final check? Listen for AQL (acceptable quality limit), a sampling method where a set number of pieces from the batch are inspected and the batch passes or fails on the defects found. A good answer names the level. Ours is AQL 2.5. "We check everything" sounds reassuring but tells you nothing measurable.
17. What measurement tolerance do you work to? Every garment varies slightly. A good factory gives a figure, such as ±1–1.5 cm, and measures against your spec sheet. If you don't have a spec sheet yet, our tech pack template is a starting point.
18. What happens if pieces arrive defective? You want three things: how long you have to report, what proof they need (photos usually), and who pays for the remake and the shipping. Ours: report within 14 days and we remake or refund the defective pieces at our cost, including shipping.
19. Can I see photos or video of my order before it ships? This is cheap for the factory and saves you from paying a balance on a problem. A good factory offers it before you ask.
Payment and shipping questions
20. What are the payment terms? A deposit to buy fabric with the balance before shipping is the standard shape. The question is how much and when. Be cautious with 100% upfront on a first order. Ours: 50% deposit, balance due after final QC photos.
21. How can I pay, and in what currency? Bank transfer is normal. Card or a payment service gives you an extra layer of protection on a first order. Check the currency so exchange rates don't eat your margin. We take Wise, bank transfer (SWIFT) and card via a secure payment link.
22. Is the price FOB or DDP? These are Incoterms, the standard trade terms that set who pays for what and where the risk passes. FOB means you handle freight from the export port and pay import duties yourself. DDP means delivered to your door with duties paid. A DDP price looks higher but often isn't once you add duties and a customs broker. Our answer on duties: You do on FOB orders; on DDP we include them in the quote.
23. Air or sea, and what does each cost for my order? Air is fast and priced per kilo. Sea is slow and only worth it at volume. Ours: express air (5–7 days) or sea freight (25–35 days). As a guide, express air about $5–7 per kg to the US and Canada, $4.50–6.50 per kg to the UK and EU; sea freight from about $1.50 per kg on 300 kg or more.
24. How will the order be packed? Individually bagged? Folded with tissue? Size stickers on the bags? Cartons labelled by size? This decides how many hours you spend unpacking and sorting.
How to check a clothing manufacturer is real
Fake suppliers and middlemen posing as factories do exist. Here are the checks we'd run before sending a deposit to anyone, including us.
- Ask for a live video call on the floor. Not a pre-recorded video. Ask them to walk to the cutting table, show a machine running, and point the camera at a garment in progress. A real factory can do this in a working day.
- Check the company is registered. Ask for the registered company name and number and look it up on the official business registry of their country. The name on the registry should match the name on the invoice.
- Pay into a company account. The bank account name should match the company. A request to pay a personal account or a different company is the clearest warning sign there is.
- Verify any certificate they mention. Certificates have numbers that can be checked. OEKO-TEX, for example, runs a public label check where you enter the number and see if it's valid. A PDF of a certificate proves nothing until you've checked it at the source.
- Look them up on a facility map. Open Supply Hub is a free, open map of production sites. Being listed is a good sign. Not being listed isn't proof of anything, because many small factories aren't on it.
- Pay for a sample before bulk. A sample is the cheapest test you can run. You learn the quality, the communication speed and whether they meet their own deadline.
Also watch how they handle hard questions. A real factory will tell you when it can't do something: a fabric it doesn't stock, a deadline it can't meet. A supplier that says yes to everything is usually a middleman who hasn't asked the factory yet.
Red flags and good signs at a glance
| Question | Good answer | Red flag |
|---|---|---|
| Minimum order | A number, per style and per colour | "Any quantity is fine" |
| Unit price | Itemised, with assumptions in writing | One number, no breakdown |
| Sample | A fee, a timeline, revisions stated | Free sample, then a large deposit |
| Lead time | Days, from a stated starting point | "Very fast" |
| Quality | Named stages and an AQL level | "We check everything" |
| Defects | Report window and remake terms in writing | "Won't happen" |
| Payment | Deposit plus balance, company account | 100% upfront to a personal account |
What to do with the answers
Put every factory's answers into one spreadsheet, a row per question. The cheapest unit price often loses once you add sample cost, labels, shipping and a weak defect policy. Then shortlist two, order samples from both, and judge on the garment in your hands and how each one communicated while making it.
If you'd like to see how our answers stack up, most of them are on our FAQ and how it works pages. Ask us the same questions you'd ask anyone else.



