Key takeaways
- 1
- A deposit plus a balance before shipping is the normal shape. Ours is 50% up front, with the balance due after final QC photos.
- 2
- Never pay the balance until you have seen QC photos and a count. Our quantity tolerance is ±3%, so the final invoice should match what was actually packed.
- 3
- Returning customers move to a 30% deposit, and you can cancel free until fabric is cut.
Clothing manufacturer payment terms almost always follow the same shape: a deposit when you confirm the order, and the balance before the goods ship. Ours are a 50% deposit, with the balance due after final QC photos, paid in US dollars (USD). The numbers vary from factory to factory. The shape shouldn't.
What matters for a first-time founder is less the percentage and more what you get before each payment. That's what this guide is about: what the deposit pays for, what you should see before you release the balance, which payment methods protect you, and the terms that should make you walk away.
What are normal payment terms for a clothing manufacturer?
A split payment. Part up front, part before shipping.
The deposit exists because a factory spends money on your order long before it can send you anything. Fabric is booked by the kilo. Rib, drawcords, labels and poly bags are ordered to your quantity. None of that can be sold to another brand once it's dyed to your colour and printed with your name.
The balance exists because you shouldn't pay in full for goods you haven't seen. Holding back part of the money until production is finished keeps the factory motivated to finish properly, and keeps you committed to taking the goods.
The US government's export guidance puts the tension neatly: from the buyer's side, any payment is "a donation until the goods are received" (trade.gov, Methods of Payment). A deposit-and-balance split is the compromise both sides can live with.
Samples are different. A sample fee is usually paid in full before the sample is made, because it's small and the work is specific to you. Ours is $40 for a private label sample, and our credit rule is simple: Credited in full against a bulk order of the same style. More on that in our clothing sample cost guide.
What does the deposit actually pay for?
On a typical first order of 100 pieces, the deposit covers the things we buy or commit to in the first week or two:
- Fabric. The largest cost in most garments. Once it's cut to your pattern, it's yours.
- Rib, trims and hardware. Cuffs, waistbands, drawcords, zips.
- Branding. Woven labels, printed labels and hang tags (our minimum is 50 per design for woven labels, printed labels and hang tags).
- Packaging. Poly bags, plus custom boxes if you've ordered them.
- Line time. Your order is booked into the cutting and sewing schedule.
This is why the deposit is the point where your order becomes real. Before it lands, nothing is bought. After it lands, money starts going out on your behalf.
When is the balance due, and what should you see first?
Ours is due after final QC photos. Before you pay a balance to any factory, ask for these:
- Photos of the finished goods. Not a sample. The bulk, folded or on a table, with your labels visible.
- A measurement check. A few pieces per size, measured against your spec. Our tolerance is ±1–1.5 cm.
- A packed count by size and colour. Factories cut slightly over to allow for faults, so the final count can move a little. Our quantity tolerance is ±3%, and the invoice should match what was packed, not what was ordered.
- The QC result. Our checks run in 5 stages: Fabric inspection on arrival, inline checks during sewing, a measurement check against your spec, a final AQL 2.5 inspection, and a packing check before cartons are sealed.
If a factory won't show you finished goods before the balance, that's the moment to slow down. Our full checklist is in questions to ask a clothing manufacturer, and there's more on inspections in our guide to QC checks before shipping.

Our payment terms in one table
No small print. These are the terms on every quote we send.
| Term | Gen-Z Fashion Apparel |
|---|---|
| Deposit, first order | 50% |
| Deposit, returning customers | a 30% deposit |
| Balance | Due after final QC photos |
| Currency | US dollars (USD) |
| Payment methods | Wise, bank transfer (SWIFT) and card via a secure payment link |
| Quote valid for | 30 days |
| Shipping terms | DDP or FOB, your choice |
| Cancellation | You can cancel free of charge before the deposit is paid, and after that until fabric is cut |
| Faulty pieces | Report within 14 days and we remake or refund the defective pieces at our cost, including shipping |
The shipping term changes what's on the invoice. On a DDP order, duties are in our quote. On FOB, they aren't, and you'll pay them to your courier or customs broker when the boxes arrive. If those three letters are new to you, the ICC's Incoterms page explains them; the short version is that they decide who pays for what between our door and yours. You'll find the rest on our pricing and MOQ page.
A worked example: what you pay, and when
Here's the order of payments on a first private label run of 100 hoodies.
| Stage | What happens | What you pay |
|---|---|---|
| Quote | Price per piece, shipping and duties set out | Nothing |
| Sample | One piece made to your spec in 15–20 working days | $40 plus $25–40 shipping |
| Confirm bulk | Fabric and trims booked, line scheduled | 50% of the order, less the sample credit |
| Production | 20–25 working days, updates twice a week, with photos | Nothing |
| QC complete | Photos, measurements, packed count | The balance |
| Shipping | express air (5–7 days) or sea freight (25–35 days) | Already in the quote |
For a run like this, the goods themselves come to around $1,750 before shipping (hoodie example, one print, woven label). So the deposit is roughly half of that, and the other half comes due when production and QC are done, usually four to five weeks later. Plan your cash for both dates, and not only the first.
A lot of founders pre-sell during production and use those orders to fund the balance. It works if your audience is ready. It's a risk if you're counting on sales you don't have yet.
Which payment method protects you most?
All three of ours are normal for international orders. They behave a little differently.
Bank transfer (SWIFT). The standard for factory payments. Cheap to send in large amounts, but once it's gone, it's very hard to pull back. Your bank may add a fee and a weak exchange rate on top.
Wise. A transfer service that usually gives a better exchange rate than a high-street bank and shows you the fee before you send. Same rule as a bank transfer: treat it as final.
Card via a secure payment link. Slightly higher fees, but your card issuer may offer chargeback rights if goods never arrive. On a first order with any overseas supplier, that extra protection is worth considering for the deposit.
For much larger orders, banks offer letters of credit, where the bank only pays once shipping documents are presented. They protect both sides but cost money and paperwork, and they're rarely worth it on a run of a few hundred pieces.
Whatever you use, pay in the currency on the quote. If you're paying in pounds, euros or Canadian dollars, check the conversion on the day. A 3% swing on a few thousand dollars is real money on a small drop.
Red flags vs what's normal
| Normal | Red flag |
|---|---|
| A deposit to start, balance before shipping | 100% up front on a first bulk order |
| Sample fee paid in full | Bulk paid in full "to get a discount" |
| Payment to a business account matching the company name | Payment to a personal account, or a different name |
| Bank details that stay the same | A last-minute email saying the bank details have changed |
| Photos and a count before the balance | "We'll send photos after payment" |
| A written quote with terms and validity | Prices only in chat messages, changing each time |
| Clear cancellation terms | No answer when you ask what happens if you cancel |
The changed-bank-details email deserves its own warning. It is a well-known payment scam, and the email often comes from a spoofed or hacked email address. If you ever get one, from us or anyone else, call or video the supplier on a number you already have before you send a cent.
What happens if something goes wrong?
Before the deposit, you can walk away with no cost. After it, our rule is simple: You can cancel free of charge before the deposit is paid, and after that until fabric is cut. Once fabric is cut into your pattern and sizes, it can't be resold, so the deposit covers that loss.
If faulty pieces arrive, report them within 14 days with photos, and we remake or refund the defective pieces at our cost, including shipping. That's why the photos, measurements and count before the balance matter so much. Most problems are cheaper to fix in the factory than after the boxes have crossed an ocean.
Get your quote in writing before you pay anything, and check it shows the deposit, the balance trigger, the currency and the shipping term. If you'd like ours, send us your designs and quantities through the quote form and we'll come back with the full price and payment schedule. If you're still working out the total budget for a first drop, start with our guide to the cost to launch a clothing brand.



