After you approve a quote, Gen-Z Fashion Apparel makes a physical sample in 7 to 15 days. Once you approve it and pay the 50% deposit, bulk takes 15 to 25 days, then a 5-stage quality check and shipping. These guides walk through each stage.
Guides in this topic
- What happens after you approve a sample Coming soon
- QC checks before shipping Coming soon
- How to plan a drop calendar backwards from launch Coming soon
See every step and how long it takes
The full timeline, with a lead-time planner.
Common questions
How long does bulk take?
15 days private label, 25 days cut and sew, from deposit and sample approval.
Total time from first message to delivery?
About 8–10 weeks for a private label first order.
How do you check quality?
5 stages, photos before shipping, third-party inspection welcome.
Still unsure? Email us. A real person answers.
