Key takeaways
- 1
- The approved sample becomes the sealed sample: every bulk piece is checked against it, so approve only what you'd be happy to receive 100 times.
- 2
- Bulk takes 20–25 working days for most private label products, with updates twice a week, with photos.
- 3
- Changes get harder by the day. Our cancellation window closes when fabric is cut, and after that only packing details are easy to change.
The bulk production process for clothing starts the day you approve your sample. From there it runs in a fixed order: the sample is sealed as the reference, you pay the deposit, fabric is booked, then the factory cuts, sews, decorates, checks, packs and ships. With us, bulk takes 20–25 working days for most private label products, and you'll hear from us twice a week, with photos while it runs.
Approval feels like the finish line. It's closer to the starting gun. This guide walks through each step, what you'll see from us at each one, and what you can still change.
What happens right after you approve a sample?
Step 1: The approved sample becomes the sealed sample
When you say yes to a sample, that physical garment stops being a draft. It becomes the sealed sample: tagged, bagged and kept as the standard bulk is judged against. Techpacker's guide to garment samples describes it the same way: once the pre-production sample is approved, it is sealed and becomes the standard for bulk production.
That has a practical consequence. If something on the sample bothered you and you approved it anyway, it will be on every piece. A slightly short sleeve on one hoodie is a quirk. On 100 hoodies it's a return problem.
Before you approve, put it on, wash it once and measure it against your spec. Our measurement tolerance is ±1–1.5 cm, so anything outside that is a correction, not an approval. Write your comments down, even "approved as is". A short email with the sample photo attached is the record both sides work from.
If you're still at the sampling stage, our sampling service explains the rounds, and on sample fees: Credited in full against a bulk order of the same style.
Step 2: Deposit and order confirmation
Next comes the paperwork that turns a sample into an order:
- A purchase order or order sheet with the style, colour, size split, decoration, label and packing details, and the quantity per colour.
- The deposit. Ours is 50% for a first order and a 30% deposit for returning customers.
The deposit is what lets the factory spend money on your behalf, mostly on fabric. Nothing gets booked until it lands. Methods, protections and red flags are all covered in our guide to deposit and payment terms, so we won't repeat them here.
One thing to settle now: your size split. On sizes: Sizes can be split any way within a style. Fabric consumption depends on it, because a 3XL uses noticeably more fabric than an S. Send the final split with the deposit, not a week later.
The bulk production process for clothing, step by step
Once the money and paperwork are in, the order moves onto the factory floor.
Step 3: Fabric booking and trims
With the deposit in, we book fabric. For a library fabric this is quick. For a specified fabric, a particular weight, finish or colour, sourcing takes 7–14 working days. Custom-dyed fabric has its own minimum of 250 kg per colour (roughly 300 hoodies).
When fabric arrives, it's inspected before anyone cuts it: shade against the approved sample, weight, width and visible faults. That's the first of our 5 QC stages.
Trims are booked in parallel. Labels, hang tags, poly bags, zips, drawcords. If your label artwork isn't final, this is where an order quietly stalls. A hoodie can be fully sewn and still sit waiting for a neck label. Branding items have their own minimums (50 per design for woven labels, printed labels and hang tags), and packaging is covered in custom packaging MOQs.
Step 4: Cutting
Cutting is the point of no return.
The pattern is graded into your sizes, and the pattern pieces are laid out on paper as a marker, planned to waste as little fabric as possible. Fabric is spread in layers on the cutting table and cut in one go, then the pieces are bundled by size and numbered so panels from the same layer get sewn together. That keeps shade consistent within a garment.
Our cancellation policy is tied to this step: You can cancel free of charge before the deposit is paid, and after that until fabric is cut. Once fabric is cut, it's your garment. It can't go back on the roll.
Step 5: Sewing
Bundles move to the sewing line, where each operator does one or a few operations. On a hoodie that means shoulders, sleeves, side seams, hood, cuffs, waistband and pocket, using overlock, flatlock and coverstitch machines in sequence.
The first few pieces off the line are checked against the sealed sample before the rest follow. After that, inline checks run during sewing: measurements, stitch density, seam strength, label position. This is where most problems are caught cheaply, while there are still pieces to fix rather than a finished order to argue about.
Step 6: Decoration
Print and embroidery usually happen on cut panels, before the garment is closed. A chest print is far cleaner on a flat front panel than on a sewn hoodie. Some decorations, like a back neck print or a garment dye, happen after sewing.
Printed panels go back to the line to be sewn in. Screen prints get a cure check. If you chose a wash or garment dye, add 5–7 working days at the laundry.
Step 7: Final QC and packing
When sewing and decoration are done, the order goes through final inspection at AQL 2.5, then packing: fold, tag, poly bag, carton, carton label. QC and packing take 3–5 working days. Our stages, in order: Fabric inspection on arrival, inline checks during sewing, a measurement check against your spec, a final AQL 2.5 inspection, and a packing check before cartons are sealed.
What AQL means, what a defect is and which photos to ask for are all in our QC checks guide. Worth reading before this step, not during it.
Expect a quantity that's close but not exact. Our tolerance is ±3%, because a handful of pieces can fall out at cutting or final inspection.
Balance and shipping
The balance is due after final QC photos. You see the finished order, then you pay the rest, then it ships. On terms: DDP or FOB, your choice. On duties: You do on FOB orders; on DDP we include them in the quote.
Shipping options are express air (5–7 days) or sea freight (25–35 days). For a first drop of a few hundred pieces, express air is usually the call: fast, and the per-kilo cost is easier to absorb than a missed launch date. Sea makes sense on bigger, heavier orders that aren't racing a date. Our guide to shipping, duties and Incoterms has the detail.
When the goods arrive, count and check them. Defects need reporting within 14 days, and we remake or refund the defective pieces at our cost, including shipping.
What updates should you expect during bulk production?
You'll hear from us twice a week, with photos. A typical sequence of what the photos cover:
| Stage | What you'll see |
|---|---|
| Fabric in | Photo of the rolls next to your sample, with the shade check |
| Cutting | Cut panels bundled by size |
| First pieces off the line | A finished piece photographed beside the sealed sample |
| Decoration | Close-ups of print or embroidery on production pieces |
| Final QC | Measurement sheet and photos from the final inspection |
| Packed | Folded, bagged, labelled pieces and sealed cartons with shipping marks |
If a week passes without photos, ask. A factory that's running your order can photograph it in two minutes.
What can you still change after approving a sample?
Less than most founders expect, and less every day. A rough guide:
| Change | Before deposit | After fabric is booked | After cutting |
|---|---|---|---|
| Size split | Free | Usually fine | No |
| Add a colour | Free (needs its own 100) | New fabric booking | Separate order |
| Label or hang tag artwork | Free | Fine if trims not yet printed | Often too late |
| Fabric or weight | Free | Costs the booked fabric | No |
| Fit or measurements | New sample | New sample, delay | No |
| Print colour or placement | Free | Usually fine | Possible on unprinted panels only |
| Packing or carton details | Free | Free | Usually fine |
The pattern is simple. Anything that changes what's cut gets expensive at cutting. Anything that changes what's bought gets expensive once it's bought. Packing instructions stay flexible almost to the end.
If you're unsure whether to change something, ask before the deposit. A day of hesitation then is cheaper than a week of rework later.
How long does the whole thing take?
For most private label orders, bulk is 20–25 working days. Full package runs 25–30 working days. Add 3–5 working days for final QC and packing if your quote doesn't already include it, then transit. From first sample to goods in hand, most first orders land in 8–10 weeks. Our how it works page has the full sequence on one page. Plan your launch date backwards from these numbers, not forwards from the day you approve.
If your sample is approved and you're ready to book bulk, send us the final size split and colours through the quote form and we'll confirm the dates in writing before you pay anything.