What happens after you approve a sample: the bulk production process for clothing

Photo: Rawpixel, CC0

After you approve a sample, the factory seals it as the reference, takes the deposit (50% with us), books fabric, then cuts, sews, decorates, checks and packs your order. With us, bulk takes 20–25 working days for most private label products, you get updates twice a week, with photos, the balance is due after final QC photos, and goods ship by express air or sea.

Key takeaways

1
The approved sample becomes the sealed sample: every bulk piece is checked against it, so approve only what you'd be happy to receive 100 times.
2
Bulk takes 20–25 working days for most private label products, with updates twice a week, with photos.
3
Changes get harder by the day. Our cancellation window closes when fabric is cut, and after that only packing details are easy to change.

The bulk production process for clothing starts the day you approve your sample. From there it runs in a fixed order: the sample is sealed as the reference, you pay the deposit, fabric is booked, then the factory cuts, sews, decorates, checks, packs and ships. With us, bulk takes 20–25 working days for most private label products, and you'll hear from us twice a week, with photos while it runs.

Approval feels like the finish line. It's closer to the starting gun. This guide walks through each step, what you'll see from us at each one, and what you can still change.

What happens right after you approve a sample?

Step 1: The approved sample becomes the sealed sample

When you say yes to a sample, that physical garment stops being a draft. It becomes the sealed sample: tagged, bagged and kept as the standard bulk is judged against. Techpacker's guide to garment samples describes it the same way: once the pre-production sample is approved, it is sealed and becomes the standard for bulk production.

That has a practical consequence. If something on the sample bothered you and you approved it anyway, it will be on every piece. A slightly short sleeve on one hoodie is a quirk. On 100 hoodies it's a return problem.

Before you approve, put it on, wash it once and measure it against your spec. Our measurement tolerance is ±1–1.5 cm, so anything outside that is a correction, not an approval. Write your comments down, even "approved as is". A short email with the sample photo attached is the record both sides work from.

If you're still at the sampling stage, our sampling service explains the rounds, and on sample fees: Credited in full against a bulk order of the same style.

Step 2: Deposit and order confirmation

Next comes the paperwork that turns a sample into an order:

  • A purchase order or order sheet with the style, colour, size split, decoration, label and packing details, and the quantity per colour.
  • The deposit. Ours is 50% for a first order and a 30% deposit for returning customers.

The deposit is what lets the factory spend money on your behalf, mostly on fabric. Nothing gets booked until it lands. Methods, protections and red flags are all covered in our guide to deposit and payment terms, so we won't repeat them here.

One thing to settle now: your size split. On sizes: Sizes can be split any way within a style. Fabric consumption depends on it, because a 3XL uses noticeably more fabric than an S. Send the final split with the deposit, not a week later.

The bulk production process for clothing, step by step

Once the money and paperwork are in, the order moves onto the factory floor.

Step 3: Fabric booking and trims

With the deposit in, we book fabric. For a library fabric this is quick. For a specified fabric, a particular weight, finish or colour, sourcing takes 7–14 working days. Custom-dyed fabric has its own minimum of 250 kg per colour (roughly 300 hoodies).

When fabric arrives, it's inspected before anyone cuts it: shade against the approved sample, weight, width and visible faults. That's the first of our 5 QC stages.

Trims are booked in parallel. Labels, hang tags, poly bags, zips, drawcords. If your label artwork isn't final, this is where an order quietly stalls. A hoodie can be fully sewn and still sit waiting for a neck label. Branding items have their own minimums (50 per design for woven labels, printed labels and hang tags), and packaging is covered in custom packaging MOQs.

Step 4: Cutting

Cutting is the point of no return.

The pattern is graded into your sizes, and the pattern pieces are laid out on paper as a marker, planned to waste as little fabric as possible. Fabric is spread in layers on the cutting table and cut in one go, then the pieces are bundled by size and numbered so panels from the same layer get sewn together. That keeps shade consistent within a garment.

Our cancellation policy is tied to this step: You can cancel free of charge before the deposit is paid, and after that until fabric is cut. Once fabric is cut, it's your garment. It can't go back on the roll.

Step 5: Sewing

Bundles move to the sewing line, where each operator does one or a few operations. On a hoodie that means shoulders, sleeves, side seams, hood, cuffs, waistband and pocket, using overlock, flatlock and coverstitch machines in sequence.

The first few pieces off the line are checked against the sealed sample before the rest follow. After that, inline checks run during sewing: measurements, stitch density, seam strength, label position. This is where most problems are caught cheaply, while there are still pieces to fix rather than a finished order to argue about.

Step 6: Decoration

Print and embroidery usually happen on cut panels, before the garment is closed. A chest print is far cleaner on a flat front panel than on a sewn hoodie. Some decorations, like a back neck print or a garment dye, happen after sewing.

Printed panels go back to the line to be sewn in. Screen prints get a cure check. If you chose a wash or garment dye, add 5–7 working days at the laundry.

Step 7: Final QC and packing

When sewing and decoration are done, the order goes through final inspection at AQL 2.5, then packing: fold, tag, poly bag, carton, carton label. QC and packing take 3–5 working days. Our stages, in order: Fabric inspection on arrival, inline checks during sewing, a measurement check against your spec, a final AQL 2.5 inspection, and a packing check before cartons are sealed.

What AQL means, what a defect is and which photos to ask for are all in our QC checks guide. Worth reading before this step, not during it.

Expect a quantity that's close but not exact. Our tolerance is ±3%, because a handful of pieces can fall out at cutting or final inspection.

Balance and shipping

The balance is due after final QC photos. You see the finished order, then you pay the rest, then it ships. On terms: DDP or FOB, your choice. On duties: You do on FOB orders; on DDP we include them in the quote.

Shipping options are express air (5–7 days) or sea freight (25–35 days). For a first drop of a few hundred pieces, express air is usually the call: fast, and the per-kilo cost is easier to absorb than a missed launch date. Sea makes sense on bigger, heavier orders that aren't racing a date. Our guide to shipping, duties and Incoterms has the detail.

When the goods arrive, count and check them. Defects need reporting within 14 days, and we remake or refund the defective pieces at our cost, including shipping.

What updates should you expect during bulk production?

You'll hear from us twice a week, with photos. A typical sequence of what the photos cover:

StageWhat you'll see
Fabric inPhoto of the rolls next to your sample, with the shade check
CuttingCut panels bundled by size
First pieces off the lineA finished piece photographed beside the sealed sample
DecorationClose-ups of print or embroidery on production pieces
Final QCMeasurement sheet and photos from the final inspection
PackedFolded, bagged, labelled pieces and sealed cartons with shipping marks

If a week passes without photos, ask. A factory that's running your order can photograph it in two minutes.

What can you still change after approving a sample?

Less than most founders expect, and less every day. A rough guide:

ChangeBefore depositAfter fabric is bookedAfter cutting
Size splitFreeUsually fineNo
Add a colourFree (needs its own 100)New fabric bookingSeparate order
Label or hang tag artworkFreeFine if trims not yet printedOften too late
Fabric or weightFreeCosts the booked fabricNo
Fit or measurementsNew sampleNew sample, delayNo
Print colour or placementFreeUsually finePossible on unprinted panels only
Packing or carton detailsFreeFreeUsually fine

The pattern is simple. Anything that changes what's cut gets expensive at cutting. Anything that changes what's bought gets expensive once it's bought. Packing instructions stay flexible almost to the end.

If you're unsure whether to change something, ask before the deposit. A day of hesitation then is cheaper than a week of rework later.

How long does the whole thing take?

For most private label orders, bulk is 20–25 working days. Full package runs 25–30 working days. Add 3–5 working days for final QC and packing if your quote doesn't already include it, then transit. From first sample to goods in hand, most first orders land in 8–10 weeks. Our how it works page has the full sequence on one page. Plan your launch date backwards from these numbers, not forwards from the day you approve.

If your sample is approved and you're ready to book bulk, send us the final size split and colours through the quote form and we'll confirm the dates in writing before you pay anything.

Questions founders ask

How long does bulk production take after sample approval?

With us, 20–25 working days for most private label products and 25–30 working days for full package. Shipping is on top: express air (5–7 days) or sea freight (25–35 days).

Can I make changes after approving the sample?

Small ones, early. Size split and packing details can usually move until cutting. Fabric, colour and fit changes after fabric is booked mean new costs and often a new sample.

What is a sealed sample?

It's the approved sample, labelled and kept as the reference for bulk. Our inline and final checks compare production pieces against it.

When do I pay the balance?

The balance is due after final QC photos, before the goods ship. Our payment terms guide covers the full schedule.

Will the bulk order be exactly the quantity I ordered?

Within a small tolerance. Ours is ±3%, because a few pieces can be lost to cutting faults or rejected at final inspection.

Still unsure? Email us. A real person answers.

Want the exact number for your drop?

Tell us the product, quantity and print. You get an itemised quote within 24 hours on working days.

About the author

Name
The Gen-Z Fashion Apparel team
Role
production and sourcing
Bio
We make small-batch clothing for new brands and write up what we learn on the factory floor: costs, fabrics, lead times and the mistakes that cost founders money.
Get a Quote